Ongoing Traffic Projects in Our Area

This article was archived from the previous WordPress site. Formatting and media should be close, but may not match the original post perfectly.
The CT Department of Transportation has recently announced the following projects expected to impact traffic in our area:
- Scheduled Closures of the Exit 33 I-95 Off-Ramp in Stratford: scheduled closures of the Exit 33 off-ramp on I-95 in Stratford between the hours of 9 AM and 3 PM on Wednesday, September 22, Thursday, September 23, and Friday, September 24, 2021. A detour will be in place bringing traffic down to Exit 34, to southbound Route 1, and back into Stratford.
- Installations and Revisions of Traffic Control Signals in Various Connecticut Towns: the department is developing plans to replace existing traffic control signal equipment with new equipment in Shelton, Stratford and Trumbull:
-
Shelton – SR 714 (Bridgeport Ave.) at Old Stratford Rd. and Commerce Dr. – Intersection No. 126-213
-
Shelton – SR 714 (Bridgeport Ave.) at Beard Sawmill Rd. and Mill St. – Intersection No. 126-215
- Shelton – SR 714 (Bridgeport Ave.) at Long Hill Cross Rd. – Intersection No. 126-235
- Trumbull – Route 108 (Nichols Ave.) at SR 743 (Penny Ave.) and Route 8/25 NB On-Ramp – Intersection No. 144-229
- Stratford – Route 110/Route 113 (N. Main St.) at Route 110 (E. Main St.) – Intersection No. 138-248
-
The design plans for the traffic control signal project are expected to be completed in January 2023 with a tentative advertising date for construction of March 2023.
Anyone interested in requesting information on this project may do so by contacting Gregory R. Palmer, Project Manager at Gregory.Palmer@ct.gov. Please make reference to Project No. 0173-0510.