This article was archived from the previous WordPress site. Formatting and media should be close, but may not match the original post perfectly.
TRUMBULL- State Rep. David Rutigliano is informing Trumbull residents that the Department of Transportation will begin work on the Pequonnock River Trail from Route 127 to Quarry Road in Trumbull.

The project consists of constructing a multi-use pedestrian trail connecting Twin Brooks Park to an existing trail on Quarry Road, beginning on or about April 1, 2017.
Work includes the rehabilitation of a historic railroad bridge that runs over the Merritt Parkway, constructing culvert tunnels under two exit/entrance ramps of Route 15 and Route 25, sidewalks, associated lighting and landscaping.
DOT Project is scheduled to be completed on December 1, 2017
LANE CLOSURE INFO
There will be limited weekend closures on the Exit 49 off ramp of Route 15 and Exit 8 of Route 25 to be announced at a future date. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
The regular work schedule for this project is from 7:00 a.m. to 3:30 p.m. (Monday thru Friday). Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.