Connecticut House GOP

    State Representative

    Tammy Nuccio
    AboutContactNewsroomDistrict MapLegislationSurvey
    Connecticut House GOP

    State Representative

    Tammy Nuccio
    Connecticut House Republicans

    Fighting for Connecticut's families and businesses with common-sense solutions.

    FacebookXInstagramYouTube

    Caucus Resources

    • Leadership Team
    • Caucus Members
    • House Republicans
    • Caucus Newsroom
    • Media Inquiries

    Legislative Resources

    • Bill & Document Search
    • Bill Information Search
    • Legislative Committees

    Documents & Surveys

    • OLR Major Public Acts 2023

    Government

    • Departments & Agencies
    • Governor's Office
    • State Budget
    • State Checkbook

    Contact Us

    Legislative Office Building, Room 4200
    300 Capitol Avenue
    Hartford, CT 06106

    860-240-8700
    800-842-1423

    Contact page

    Citizen Guide

    • 2021 Redistricting Project
    • About Connecticut
    • How to Testify
    September 15, 2022

    Mill and Overlay Resurfacing on I-84 Eastbound between Exit 68 to Exit 71 and I-84 Westbound between Exit 71 and Exit 67 (including ramps) in Vernon, Tolland, and Willington

    Mill and Overlay Resurfacing on I-84 Eastbound between Exit 68 to Exit 71 and I-84 Westbound between Exit 71 and Exit 67 (including ramps) in Vernon, Tolland, and Willington
    This article was archived from the previous WordPress site. Formatting and media should be close, but may not match the original post perfectly.

    The Connecticut Department of Transportation (CTDOT) is announcing temporary ramp detours associated with the milling and paving on I-84 Eastbound between Exit 68 to Exit 71 and I-84 Westbound between Exit 71 to Exit 67 (including ramps) to begin on Sunday, September 11, 2022.

    This project consists of milling and overlaying portions of I-84 and associated bridges and ramps in the Towns of Vernon, Tolland, and Willington. (Eastbound between Exit 68 to Exit 71 and Westbound between Exit 71 and Exit 67) This project also involves reconstruction of deck ends, bridge joint work, membrane, and intersection improvements at Int. 142-204 (Tolland).

    LANE CLOSURE INFO – In addition to lane closures previously posted, starting September 11, 2022 and continuing through the fall with an anticipated winter shutdown around November 30, 2022, there will be various ramp closures with associated detours on I-84 Eastbound between Exit 68 to Exit 71 and I-84 Westbound between Exit 71 and Exit 67, Sunday through Friday from 8:00PM to 6:00AM.

    DETOUR INFO – Expect Ramps to be periodically closed with associated detours starting Sunday, September 11, 2022 between the hours of 8:00 PM and 6:00 AM. Anticipated completion is November 30, 2022. The following detours may be implemented:

    ON RAMPS:

    • I-84 EB Exit 69 On Ramp will be detoured on Rt. 74 to I-84 WB to Exit 68 WB back to I-84 EB.
    • I-84 WB Exit 68 On Ramp will be detoured on Rt. 195 to I-84 EB to Exit 69 to Rt. 74 to I-84 WB.
    • I-84 WB Exit 69 On Ramp will be detoured on Rt. 74 to I-84 EB to Exit 70 to Rt. 32 to I-84 WB.
    • I-84 WB Exit 70 On Ramp will be detoured on Rt. 32 to I-84 EB to Exit 71 to Rt. 320 to I-84 WB.

    OFF RAMPS:

    • I-84 EB Exit 69 Off Ramp will be detoured to Exit 70 Rt. 32 back to I-84 WB to Exit 69.
    • I-84 EB Exit 70 Off Ramp will be detoured to Exit 71 Rt. 320 and back to I-84 WB to Exit 70.
    • I-84 WB Exit 68 Off Ramp will be detoured to Exit 67 Rt. 31 and back to I-84 EB to Exit 68.
    • I-84 WB Exit 69 Off Ramp will be detoured to Exit 68 Rt. 195 and back to I-84 EB to Exit 69.

    REST AREAS:

    • I-84 EB Rest Area will be closed during paving operations. Traffic will be detoured to Exit 71 for Rt. 32 and back to I-84 Westbound Rest Area.
    • I-84 WB Rest Area will be closed during paving operations. Traffic will be detoured to Exit 69 for Rt. 74 and back to I-84 Eastbound Rest Area.

    Latest Posts

    Rep. Nuccio Earns Perfect Voting Record for the 2025 Legislative Session

    Rep. Nuccio Earns Perfect Voting Record for the 2025 Legislative Session

    HARTFORD – State Representative Tammy Nuccio (R-53rd) earned a 100% voting record for all roll call votes taken on the floor of the House of Representatives during the 2025 legislative session. The House Clerk’s Office recently released data showing that Rep. Nuccio had cast a total of 381 votes, giving her a perfect record. “The […]

    September 10, 2025
    Rep. Nuccio Encouraging Residents to Take Part in Flag Collection Event with BSA Troop 82 in Willington

    Rep. Nuccio Encouraging Residents to Take Part in Flag Collection Event with BSA Troop 82 in Willington

    WILLINGTON – State Representative Tammy Nuccio (R-53rd) is partnering with BSA Troop 82 to help residents retire their worn or frayed U.S. flags in a dignified and respectful way. There will be two separate drop-off locations in Willington for flags that are no longer in a condition to be displayed. The collection drive will take place […]

    September 9, 2025