This article was archived from the previous WordPress site. Formatting and media should be close, but may not match the original post perfectly.
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on Route 69 in Woodbridge and Bethany. The project consists of resurfacing 3.45 miles of Route 69 in Woodbridge and Bethany. This project is scheduled to occur on Tuesday, July 29, 2014 through Thursday, August 7, 2014. This project is included in the Department of Transportation’s 2014 Vendor Resurfacing Program.
LANE CLOSURE INFO
Motorists can expect lane closures on Route 69 from begin N/B TCL to Wooding Hill Road Extension. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:30 a.m. to 5:00 p.m. (Monday – Fridays). Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.