A Guide for Testifying at Public Hearings and Reaching State Legislators: Click Here...


Bridge Deck Strip Patch Membrane Overlay (SPMO) Program on I-84 in Danbury

Posted on March 28, 2024

The Connecticut Department of Transportation (CTDOT) is announcing that a bridge deck strip patch membrane overlay project will begin on I-84 in Danbury on April 8, 2024. Depending on location, traffic patterns will be set at either 8:00 p.m. or 9:00 p.m. This project consists of the rehabilitation of eleven (11) bridges from Exits 3 to 7 on I-84 in Danbury. The project scope consists of milling, drainage upgrades, concrete deck repairs, and paving.

CTDOT Project No. 0034-0358 was awarded to Mohawk

2024 Center Line Rumble Strip Project in Danbury, New Fairfield

Posted on March 22, 2024

The Connecticut Department of Transportation (CTDOT) is announcing that Center line and shoulder Rumble Strip will be performed on multiple routes in Harwinton, Torrington, Sharon, Salisbury, Suffield, Canton, Colebrook, Washington, North Canaan, Thomaston, Plymouth, Waterbury, New Fairfield, Danbury, Beacon Falls, Bethany, Seymour, Derby, and Ansonia. The work is scheduled to begin on or about Monday, April 1 and continue through Friday, October 11, 2024. Epoxy Pavement Markings will also be performed.

Information About Early Voting

Posted on March 22, 2024

Early voting was approved by Connecticut voters in 2022. During the 2023 legislative session, the General Assembly authorized in-person early voting for elections held after April 1, 2024. Under this schedule, the first election utilizing early voting will be the Presidential Preference Primary on April 2, 2024.

The early voting dates for this election have been modified to reflect the Good Friday holiday and Easter Sunday. Early Voting will be held Tuesday, March 26 through Thursday, March 28 and

X